TY - JOUR AU - Halyna Yevhrashkina AU - Anastasiya Omelchuk PY - 2012/02/29 Y2 - 2024/03/29 TI - Forecast level in the groundwater regime in the territory adjacent to the pond - storage devices waste mine water "SVIDOVOK" JF - Journal of Geology, Geography and Geoecology JA - JGGG VL - 20 IS - 3/2 SE - DO - https://doi.org/10.15421/111211 UR - https://geology-dnu.dp.ua/index.php/GG/article/view/59 AB - The hydrodynamic scheme layer-bond is proposed for long – term level regime forecast. Which takes into account the rising ground waters under the influence by hydrodynamic schemes: of the pond and of the river Samara. The process is described with Fourier’s equation. The method of double superposition is used in the calculations, which the most accurately accounts for the effect of boundary conditions.Key words: forecast, the Fourier equation, the method of double superposition ER -